A construction operating system
Build the
unbuildable,
on schedule.
Projects orchestrated
1,284
across 6 markets
Avg. delay reduced
−37%
vs prior 12-month baseline
Saved per project
SAR 480k
median, FY25 cohort
Crews on site
Schedule health
Open risks
"We replaced four spreadsheets and a WhatsApp group with one screen."
— Site Director, Jeddah
§ 02 · The platform
Six modules.
One operating layer.
Most construction software gives you a system of record. TheBuildOps gives you a system of action — every module wired to the same intelligence, the same crew list, the same budget line. Nothing falls through the cracks because there are no cracks.
Project Management
Timelines, milestones, tasks and live progress feeds — replanned by AI when reality drifts.
Workforce & Contractors
Assign crews, track attendance, score performance across subs and trades.
Budget & Cost Control
Planned vs. actual, category drill-down, predictive overrun alerts in SAR.
Procurement & Inventory
Suppliers, POs, deliveries and material consumption per site, in real time.
Site Updates
Daily reports, geo-stamped photos and progress notes from any device.
Document Management
Contracts, drawings, RFIs, versioning, tags — searchable in Arabic and English.
§ 03 · Intelligence
AI that earns its hard hat.
Risk Prediction
Every project scored Low / Medium / High with the reasons — before the site meeting.
Cost Forecasting
Final-cost projections updated nightly. Catches overspend patterns weeks early.
Vision Progress
Compares planned BIM with site photos to verify what was actually built.
Copilot Chat
Ask in Arabic or English. Grounded in your live project, cost and crew data.
§ 05 · Field manifest
Every project, every line item,
on one page.
§ 04 · Copilot
Ask anything.
Answers, not dashboards.
A chat that already knows your projects, costs and crews — grounded in your data, fluent in Arabic and English, and never makes up numbers.
- 01Which project is at risk this week?
- 02Why is Riyadh Tower delayed?
- 03Show cost overruns this month in SAR
- 04Draft tomorrow's site report for Jeddah Mall
Schedule slip 11d · 18% over budget
Concrete delivery delayed · crew −12%
